Two Days, Six Steps

From first knock to flow-tested handoff.

Here's the day-by-day: day one is removal, substrate and waterproofing with flood test; day two is tile, grout and detail with flow test. Simple re-tiles on sound pans compress to a long single day. Glass stays up or comes down carefully depending on your enclosure — either way it's our responsibility, in writing.

Middletown notes

In Middletown most floors run a day and a half door-to-door: Middletown rental turnover drives year-round surround and shower-floor work — durable porcelain, dark grout, sealed twice. Shower again 24 hours after grout — we'll time it to the hour, not the day.

  1. Diagnose. Moisture map, pan assessment, fixed written quote — free.
  2. Remove. Floor out to a clean wall line; walls, glass protected.
  3. Rebuild base. Slope verified or re-poured; membrane + clamped drain.
  4. Flood test. Pan proven watertight before a single tile is set.
  5. Tile & grout. Full-coverage set, epoxy grout, sealed transitions.
  6. Flow test & walkthrough. Drain proven, punch-listed, care guide in hand.
Materials

The Middletown floor sequence

What goes under Middletown feet: the shortlist we install and warranty.

Porcelain 2x2

Slope-perfect standard.

Unglazed quarry

Old-school grip, sealed.

River pebble

Massage texture, sealed twice.

Mini brick-joint

Lines with traction.

FAQ

Common questions

Who hauls debris?

We do — old tile, mud bed chunks, packaging. Your curb stays clean.

Do I need to be home?

For diagnosis and walkthrough yes; workdays are fine with a key — contained area, one crew, locked up after.

What about my glass doors?

Protected in place or removed to padded storage and reinstalled — our responsibility either way, stated in the quote.

Day-by-day, what happens?

Day one: remove, rebuild base, waterproof, flood test. Day two: tile, grout, detail, flow test, walkthrough. Single-day compressions for simple re-tiles.